Your Future Building Has Arrived—Now What? A Practical Steel Building Maintenance Guide

Your Future Building Has Arrived—Now What?
So, your steel building kit has arrived—or maybe it’s already up. Either way, congratulations! Let’s walk through what comes next in this practical steel building maintenance guide.
Before you officially consider the job done, there are a few simple but critical steps you should take to make sure you’re getting the long-lasting performance and protection your arch-style building is designed to deliver.
This post-delivery/construction guide covers what to do right after delivery, how to prevent leaks, ongoing maintenance tips, and how to stay covered under warranty. It also explains why Future’s 60-day support policy gives you a clear advantage over other suppliers—and how to make the most of it.

🔍 Step 1: Inspect Your Delivery Thoroughly
When your building kit arrives, you may be tempted to set it aside until you’re ready to build. But don’t skip this step: a quick inspection now can save major headaches later.
✅ What You Should Do:
- Cross-check the shipment against your packing list and Bill of Lading
- Inspect bundles for visible damage or missing components
- Note any issues directly on the carrier’s paperwork before signing
- Store materials off the ground, under cover, and with airflow if construction is delayed –See your Building Guide form more details
- Keep hardware kits and small parts stored securely
- Write your order number on the front of your building guide—this helps anyone (including your builder or contractor) report concerns quickly if needed
🕓 Why Timing Matters: Use the 60 Days Wisely
Many companies give you just 30 days to report missing or damaged components. At Future Buildings, we do better. Our 60-Day Warranty Against Shortages and Defects gives you double the time to catch and report any issue.
🛠️ Step 2: Preventing Leaks Starts with Proper Installation
Let’s be clear: your Future Steel building is designed not to leak.
Leaks, when they do occur, are nearly always the result of installation errors. And per our Building Guide, preventing leaks is the sole responsibility of the installer. Leaks are not covered by warranty.
As part of your steel building maintenance guide, here’s how to avoid them:
🧰 Leak Prevention Checklist:
- ✔ Inspect your panels before installation—do not use any that are bent or damaged
- ✔ Avoid elongating or tearing bolt holes, which prevents a proper seal
- ✔ Panels must be fully drawn together before bolts are tightened
- ✔ Do not over-tighten bolts—this can damage sealing washers
- ✔ Install bolts straight and level, not at angles
- ✔ Overlap panels correctly, as outlined in your guide
- ✔ Position arches so overlaps face away from prevailing winds and rain
- ✔ Use butyl caulking and weatherproof sealant around:
- Base plates and connectors
- Door and window frames
- Curve angles, vent adapters, and skylights
Leaks are almost always avoidable—and catching installation issues early is far easier than repairing later.
✅ Step 3: Final Completion Checklist
Before removing any bracing or declaring the job complete, go through this list as the final step in your steel building maintenance guide:
- Foundation matches plans and all anchoring is done (tie-downs, grout, bolts)
- Arches are shaped to spec and bolted correctly
- Panels are installed in correct locations and gauges
- All fasteners are in place and properly tightened
- Accessories (windows, doors, vents) are installed and sealed
- End walls, curve angles, and wind bracing/stiffeners are in place
🧹 Step 4: Steel Building Maintenance Tips for Long-Term Protection
A properly built and well-maintained steel building will last for decades. Here’s how to keep it that way.
🧾 Protect Your Warranty:
We offer two key long-term warranties for your peace of mind—both of which depend on proper steel building maintenance and construction practices:
- 50-Year Limited Warranty Against Perforation from Oxidation
Galvalume Plus® steel panels are warrantied against rust-through from atmospheric corrosion.- Avoid:
- Salt spray or animal waste
- Damp insulation
- Contact with copper, lead, or corrosive chemicals
- Standing water or blocked drainage
- Avoid:
- 30-Year Limited Warranty for Snow and Wind Damage
This applies to buildings that are properly constructed and anchored as per blueprint specs. Be sure your foundation and fasteners meet the exact requirements noted in your certified drawings.
🧰 Seasonal Steel Building Maintenance Checklist:
- Remove snow buildup promptly—don’t exceed design load
- Inspect caulking/sealants annually, especially after winter
- Keep gutters and base plates clear of debris
- Clean surface grime with mild dish soap and lukewarm water
- Look for rust, scratches, or wet storage stains—treat with aluminum paint if needed
- Do not attach additional loads (mezzanines, signage, heavy fixtures) unless specifically engineered
- Do not relocate or rebuild your structure without first confirming site compatibility with Future’s team
Build With Confidence
When you choose Future Buildings, you get more than just steel and bolts. You get decades of experience, engineer-approved building systems, and a support team that’s here long after your delivery arrives.
The steps you take right after delivery—and throughout seasonal steel building maintenance—can make all the difference. From taking advantage of our 60-day reporting window to sealing properly and maintaining seasonally, you’re protecting your investment and avoiding the kinds of headaches other suppliers leave customers to deal with on their own.
Have questions about your build, your warranty, or what comes next?
📞 Call the factory directly using the number on your building guide; We’re here to help you build it right—and enjoy it for decades to come.
We want your build to go smoothly from start to finish. That’s why we build in extra time, clear policies, and dedicated support — so you can focus on your project without surprise setbacks.
If you haven’t made a purchase yet, or are considering another, request a quote here or visit our Clearance Buildings here.
Also, check out our sister company, Toro Steel Buildings for more straight-wall styles or larger scale projects.
Related posts

Latest Blogs
Your Future Building Has Arrived—Now What? A Practical Steel Building Maintenance Guide
Your Future Building Has Arrived—Now What? So, your[...]
Summer Deals on Steel Buildings
Summer Deals on Steel Buildings: Why Summer is a[...]
Hollywood’s Favorite Steel Building: The Pop Culture Rise of the Quonset Hut
The Pop Culture Rise of Quonset-Style Steel Buildings If you’ve[...]
How One Canadian Customer Transformed Their Business with a Future Buildings Quonset Hut! 🇨🇦
The Story of Emma and David: A Business Transformation[...]